Characterization of Failed First-Stage Turbine Blade Cooling Passage of Gas Turbine Engine

Journal of Failure Analysis and Prevention, April 2015, Volume 15, Issue 2, pp 258-265.

Alaaeldin H. Mustafa.

Mechanical Services Shops Department, Saudi Aramco, Dhahran, Saudi Arabia.

 

Abstract

The cooling passages of the first-stage high-pressure turbine blades of gas turbine engines are located and drilled at the manufacturing stage. The external wall thickness is a critical blade strength parameter and has to be inspected accurately and regularly when blades are routed through repair work shops. This paper investigates a case of two blades from two different blade sets that experienced cooling passage failure during repair, after serving less than 20,000 operating hours. The investigation covered material microstructure, hardness condition, and material thickness residual assessment, using an ultrasonic nondestructive technique between the first cooling passage and the external blade surface. It was concluded that the first cooling passage was inappropriately drilled during manufacturing.

Go To Journal

high-pressure turbine blades of gas turbine engines

 

Check Also

Fatigue Crack Growth Behavior of WAAM Steel Plates: Experimental Analysis and Comparative Study - Advances in Engineering

Fatigue Crack Growth Behavior of WAAM Steel Plates: Experimental Analysis and Comparative Study