Laboratory tests for measuring the time-lag of fully grouted piezometers

Journal of Hydrology, Volumes 438–439, 17 May 2012, Pages 215-222
L. Simeoni

Department of Mechanical and Structural Engineering, University of Trento, Via Mesiano 77, 38123 Trento, Italy

Abstract

Time-lag is the most important parameter describing the conformance of a piezometer because it represents the time that it takes for the instrument to reach equilibrium when there is a pore water pressure change in the soil. The use of fully grouted piezometers would make the installation easier and faster than the conventional one, since it prevents the failure risks during the placement of the sand pack and the overlying bentonite seal. This paper describes a number of laboratory tests performed to evaluate the time-lag of fully grouted piezometers. A pore water pressure change was applied at the bottom of cylindrical samples of grout and the pressure equalization was measured at the top. The samples were made of a cement–bentonite mixture and were 2 cm, 4 cm or 8 cm in height. Time-lags resulted in no longer than 6 min, that is a time generally acceptable in geotechnical projects. It was also found that the time-lag relies on the pore water pressure value. For a given draining path length, the higher the pore water pressure the shorter the response time. This behavior has been explained by assuming that the time-lag depends on both the hydraulic and compressible characteristics of the grout mixture and that these characteristics vary with the pore water pressure because the grout is in a quasi saturated state.

Go To Journal

 

Check Also

Fiber Break Displacement Maps Stress Redistribution in Notched CMC Laminates

Significance  Reference Xiaoyi Guan, Yana Wang, Jian Jiao, Zhengmao Yang, Hierarchical modeling of strain-concentrating effect …